Validated HVAC Performance Impact through Rigorous Measurement & Verification

ThermaClear® was validated through rigorous field testing using real-time monitoring aligned with the International Performance Measurement and Verification Protocol (IPMVP)*. Industry-standard sensors captured key performance metrics—temperature, humidity, air flow, and energy use—every minute over a 3–9 month period. A baseline was established prior to treatment, followed by post-treatment monitoring. Performance was then evaluated by comparing statistically significant data sets under similar operating conditions—accounting for weather and building load—to accurately quantify improvement. 

Find a Preferred Service Partner

Case Studies

Water Cooled
Phoenix Art Museum
106,756 kWh reduction in energy consumption annually
VIEW CASE STUDY
Air Cooled
Phoenix Sky Harbor
17,047 kWh reduction in energy consumption annually
VIEW CASE STUDY
DX Equipment
Arizona State University
64,211 kWh reduction in energy consumption annually
VIEW CASE STUDY
DX Equipment
Facilities Services Corporation
31,522 kWh reduction in energy consumption annually
VIEW CASE STUDY
Water Cooled
Miami Tower
129,284 kWh reduction in energy consumption annually
VIEW CASE STUDY
Water Cooled
Signature Flight Support
41,090 kWh reduction in energy consumption annually
VIEW CASE STUDY
DX Equipment
Retail Bank Branch
12,976 kWh reduction in energy consumption annually
VIEW CASE STUDY
DX Equipment
Energy Savings for Warehousing
13% annual energy savings
VIEW CASE STUDY
DX Equipment
Energy Savings at SJI International
20% annual energy savings
VIEW CASE STUDY

Create your account